Installation method and precautions of decorative concrete board

View:74827Time:10 Mar,2025

    Decorative concrete board is a new type of board. Compared with ordinary materials, it is easier to operate and lighter in weight. It will not absorb water easily in rainy weather, will not mildew, and will not change acid and alkali. It is also more resource-saving because it can be used repeatedly. The following editor will specifically introduce how to use decorative concrete board correctly.

01 Installation method of decorative concrete board:

1. Dry hanging construction method

1. For walls with good flatness, no keel leveling and lining are required. A layer of varnish can be applied on the wall to solidify the wall.

2. Mark the position of the fixed point on the decorative concrete board to be used (the spacing between the nail holes should be less than 300mm and not less than 15mm from the edge of the board), and pre-drill the board with a twist drill according to the position on the wall.

3. Use an electric hammer to drill holes at the drill mark position on the wall and fill them with nylon expansion screws (diameter 6-8mm).

21.jpg

4. Apply glue to the inner side of the board first, and then fix it to the expansion screw at the same position with self-tapping screws.

5. Note: The nail head should sink into the board 0.5-1mm to facilitate the handling of nail holes.

2. Keel screw fixing method

1. Clean the wall to be installed and level the wall.

2. Use a 20×30mm wooden keel to make a 300-400mm frame on the wall (or a C50 light steel keel with a U-shaped card to cover the keel wall, with a spacing of 400mm).

3. Apply glue to the frame and fix the four corners of the cut decorative concrete board to the frame with self-tapping screws.

4. To prevent the deformation of the frame from causing the board to arch, the middle position of the board should also be fixed with self-tapping screws.

5. Note: The nail head should sink into the board 0.5-1mm to facilitate the handling of nail holes.

02 Precautions during installation:

1. The work site must meet the safety requirements of board construction, build a simple operation shed, have basic fire prevention equipment, and guardrails, and make an overall and reasonable layout of the boards in advance.

2. If you need to manually move larger and heavier boards, you need a more professional staff member to direct the movement, and ensure that the rope used is hard and firm, and the bottom of the support should be strengthened to prevent sliding or tipping.

21.jpg

3. During the construction process, if one or more boards need to be erected separately, temporary supports need to be temporarily set up and the top needs to be fixed up and down.

4. After the construction is completed, it is necessary to use wood supports to fix its position to prevent the board from tipping over. After the support is completed and firm, you can continue to operate.

5. During the installation, the construction workers need to be protected.

6. During the demolition work, the boards must be removed in order, and a restricted area must be set to prevent people around from approaching and avoid unnecessary injuries.

7. When removing longer boards, use ropes to slowly pull them out to prevent them from falling and being damaged.

    After reading the above, I believe that everyone has a certain understanding of the installation of decorative concrete panels. I hope that the editor's sharing will be helpful to everyone's future use! Our company is new to decorative concrete panels. If you are looking for decorative panels suitable for indoor and outdoor use, concrete decorative panels are an excellent choice. One-piece production will make any area you install it in more visually appealing. As long as you are careful and take good care of the stone, it will remain beautiful for many years. Please click here to learn more about Concrete decorative slab More information on styles.

SAVE 10% TODAY* WHEN YOU SIGN UP TO RECEIVE EMAILS.

Join our newsletter for cost-effective products, get catalogs,
special offers, and discount on our latest products.

PRODUCTS

ABOUT US

CONTACT US

  • Jax Zeng
  • +86 13392884491
  • +86-0755-33574777
  • JaxZeng@mfgconcrete.com
  • 104 South, No. 96, Liuhe Road, Liuyue Community, Henggang Street, Longgang District, Shenzhen