MILO micro cement construction process
1. Apply sealing agent by rolling first, curing the foundation and preventing the bottom from delaminating and keeping the water absorption rate consistent.
2. Hang the net to scrape the base material (1 bucket of resin + 1 package of base material + 1 bottle of color paste mixing well) construction 3 times.
3. sandpaper sanding once, clean up the dust (such as too much dust, need to use sealer 1:1 water roll coating once).
4. Scrape the fabric (1 bucket of resin + 1 package of fabric + 1 bottle of color paste mixed well) 3 times.
5. Sandpaper sanding once, clean up the dust, with special sealer roll coating once.
6. After the surface is leveled to achieve the effect, roll coating mixed cover 3 times (each layer must be dry).
7. Conserve 7 working days, not work on the job.
Remarks:
1. Walls with special wall materials to use, with clear notes.
2. floor with ground special material to use, with clear notes.
3. such as in the use of the process, the material dry a little fast (according to the environment), can be appropriate to add the slow drying agent material mixing (not more than 1 kg per barrel); special reminder of the amount of each barrel need to be consistent.
4. construction process, a large area of the wall or the ground, need to match more than a few workers at the same time construction, so as to avoid the connection and the inner corner of the role of the outside difference.
5. do wall and floor space, need to do the wall first, and then construction of the ground, corner joints to do smooth edging.
6. Stirred material should be used up at once, not too long interval.
https://youtu.be/aLm-qEA3G0I